Post
by ktruff46 » Dec 19th, 2019 12:21 am
Far from being done, just stalled for a while. In 2015 I moved. In 2016 I changed jobs. In 2017, I moved again from Ca. to Arizona AND changed jobs again. So with all the changes and doing projects with the new house, the Vette took a back seat. However, things are starting to settle down again, and with us owning after renting for 12 years, I can finally get my shop settled down again.
The plan is to get organized after the holidays, and begin work on the Vette again. I still need to finish repairs to the front clip, including bonding in a new drivers’ side wheel well, and get it reinstalled in the car. Once that is done, it will be time to tear down the tired old 350 and get it checked, boiled, and rebuilt. The trans will be next and then the wiring.
Still lots of work ahead but at least I have a working plan once again.
Hope everyone has a great Christmas and a wonderful new year!
Ken